Histories

Client 4

Gengiskahn Furniture

(Dec.2010 ~ May 2011)

Building Repair 44,000sqf, $0.8mil
Upgrade existing building Fire alarm
Fire protection
New build ADA ramp, entrance door
Repair roof & wall
Electric lightings
Drain system for parking lot

06da5860c34233d9fb8cd3e97b277407.jpg

GTA Teleguam, LLC

(Feb. 2010 ~ Oct. 2010)

Fire-wire Project (Telecommunication), labor $2.5mil
Recondition all cable pair(s)
Section all sizes of cables if necessary
Replace pedestal
Change out all existing ground harness and replace with # 6 AWG ground harness
Install 5/8 X 5’ ground rod and 5/8 clamp.
Each shield bond and harness ground must be torque at 35 inch pounds, to include the buss
bar on the pedestal.
Replace all shield bond connector on each cable
Cable binder ribbons must be removed and replaced with colored coded cable ties.
Cable(s) and pairs must be dressed and secured to pedestal bracket.
Tag all cables in pedestal with size
Bond all cables to bus bar provided in pedestal
P-gravel is required

1200px-AT&T_logo_2016.svg.png

AT&T

(Nov. 2008 ~ Apr. 2009)

Guardrail, Chain Link Fence, Auto Gate & Security System, $1.8mil
Placement of traffic guardrail at Telecommunication Facility.
Chain-link fencing and automatic sliding gate installation.
Testing of gate operator and data circuits.

Client 8

Emerald Ocean View Park Model Home

(Jul. 2009 ~ Mar. 2010)

Metal Works 3-Tower Crane & Metal Structure, Labor $1.9mil
Installed Metal Doors
Installed Metal Decorations
Installed Metal Roofing
Installed Metal structures
Installed Metal Railings
Fabrication by manufactures, Local shop
Supply to install

ohs-orig_orig.png

OKKODO High School

(Dec. 2008 ~ Jul. 2008)

Fire Protection Sprinkler System, $1.2mil
Installed over 4,000 sprinkler head in the new school building with fire hose and box.
Install main and branch piping from pump room to each building end for fire protection system.

TALO_VERDE_LOGO_350X130-01-1.png

Talo Verde, Guam

(Jul. 2007 ~ Apr. 2008)

Retaining Wall Civil & Structure 28’H x 3,000 LF, $3.6mil

Civil, Concrete Structure and Finishing work

Total 2,140lf in length, 9' ~ 31' High, 12" ~ 30" Thick with Concrete fence wall on top and
drainage system.

Client 5

Calvo Arriola Building

(Jun. 2007 ~ Nov. 2007)

Exterior & Interior Renovation Commercial Building, $1.5mil
Installed exterior Fascia, Painting, Interior, Restroom, Electrical and Mechanical.

Client 6

Flores Lyn & Tim Amour

(Mar. 2007 ~ Apr. 2008)

Nimitz Hill Single Home 3,800 SF

Project includes Civil, Structure, Electric, Plumbing, Mechanical and Finishing Materials, Labor,
Equipment and Materials.

Projects: Clients
ohs-orig_orig.png

GPA Cabras Power Plant

(Mar. 2006 ~ Oct. 2006)

New Sea Water intake line 48” HDPE Piping

Survey and excavate existing steel pipe.

Demolition and Replace HDPE 900mm Pipeline for Engine Cooling

Rebuild under ground Concrete Encasement

Earth work 2,200 lf

Remove and demolished 1450mm existing steel pipe under ground.

Fabricate and install New 900mm HDPE Sea water intake line and discharge line under
ground with concrete encasement.

ohs-orig_orig.png

FedEx & FHP C.T.S.I. Building

(Dec. 2005 ~ Apr. 2006)

Interior Renovation and remodeling 12,000 SF
Steel Structure work, Interior wall, floor, Ceiling, Electrical, A/C work and Plumbing Work.

Client 7

Guam Daiichi Hotel

(Mar. 2005 ~ Oct 2005)

Chiller, Pumps, Tanks, Boiler, Cooler Tower (Mechanical Work)
Installed Chilled water line, Condenser water line, Chiller Pumps line.
Installed Water tank and line, Water Heater and line, Cooling Tower and line.
Domestic water pump and line, Sump pump and line, Fire pump and line.
Most piping at 4" 8" Steel, copper, ductile pipe lines.

ZzdofIb__400x400.jpg

Hotel Nikko Guam

(May. 2004 ~ Nov. 2004)

Civil, Structure, Mech/Electric work Pavilion & Chapel

Build new BBQ Pavilion, Renovated Pool Bar and Restroom.

Structure of new Chappell and Mechanical Electrical work included materials, labor and
equipment.

ZzdofIb__400x400.jpg

Agana Shopping Center

(Jun. 2003 ~ Mar 2004)

Steel Structure and Mechanical work , labor $1.5mil
Remove and replace existing roof and structures with Steel Structure and roof for mezzanine
Replace new Mechanical work and Interior decoration.

ZzdofIb__400x400.jpg

Leo Palace Hotel Resort

(Jun. 2002 ~ May 2003)

Mechanical, Electrical work , labor $1.2mil
Install New Mechanical piping of Fire sprinkler, Chilled Water line, Swage line, cold and hot
water line with Equipment in Hotel and swimming pool mechanical room.
Also installed Water supply and drainage system, water filter tanks, pumps and chemical
chlorine.
Out Rigger Hotel Resort (Jan 1997 ~Nov 1999)
Structural Steel and Concrete structure of hotel 28 story 460 room, labor, $3.5mil

ZzdofIb__400x400.jpg

Guam International Air Port

(March 1994 ~ Dec 1998)

Structural Steel, Precast Concrete Installation, Labor, $4.8mil

Client 6

Maeda Corp Japan, Guam project

(Sept 1993 ~ Dec 1996)

Genghiskan warehouse, Guam Business Commercial Building, A One storage
warehouse, Fidelity Enterprise warehouse, Sunny wholesale warehouse, Guam Port
Warehouse Structural Steel and finishing work for sub contract labor, $3.6mil

Projects: Clients

Aug 25 2012- Jan 29 2013

Civil work as General contractor

Constructed new Parking lot for Prestige Auto display parking at Upper Tumon
Cleaning, Grading, Sewer and Water line, Telephone and Eletric power line
Perculation Drainage system, Ponding Basin, Parking curv, Asphalt Paving
Eletrical Lighting system and new entrance easment road.

Aug 11 2012 - Oct 05 2012

Mechanical work as subcontractor

Remove and Replace Traveling Screen and  Filtering system with Pumps for Cabras Power plant # 3 and #4 Sea water intake Facility.

Jul 02 2011 - Jul 31 2012

Mechanical work as subcontractor

Mechanical work on Ironwood Phase II project on Ypao Rd, Tamuning
HVAC system, Fire Protection Sprinkler, Plumbing Sewer, water for 36 units residence condominium with supply materials

Projects: CV

Structure work as General contractor

Mar 30 2011 - Jun 29 2011

Constructed concrete wall and slab for existing Chiller protection
Retaining wall with slab, Chain link fence and gate, Steel stair and platfrom 
palstering and paint finished.

Telecomunication work as general contractor

Mar 30 2010 - Oct 30 2010

Telecomunication repaire and resplicing on GTA street pedestal Island wide  Remove, Replace, Repaired on Telephone line pedestal and cable wires Chalapago, Mangilao, Inarajan, Malolo, Ordort, Dededo, Barigada viliages.

Civil work as general contractor

Nov 30 2009 - May 29 2010

Constructed High way Guardrail, Property chani link fence and gate Remove and new contructed drive way auto gate system for 2 access with eletrical and painting.

Projects: CV